market@fsthebest.com

+86-757-8209-0767

Product Categories

Foshan TheBest Industries Co.,Ltd

Address: NanHai XinbDeshe industry estate 2-18A, Guangdong, Foshan

TEL +86 ) 757 820 907  67-806 

FAX:+86) 757 820 907  67

Email to : market@fsthebest.com

Home > News > Content
Shower Installation Feb 08, 2017

1, ready to use tools they need.

2, install the bottom basins: assemble tray parts, adjust the lower basin level, ensure that basin, pelvic floor without water. Hose with distance scale, the pelvic floor and the floor drain securely attached.

3, test, protection: packed water testing is required to ensure smooth flow of water. Four bits, drilling: with a pencil and spirit level to determine aluminum drill-bit against the wall, with an impact drill holes.

4, install aluminum: drill type rubber, Aluminum bars lock to the wall with screws.

Previous: Shower Notes